external suction system with filter, motor, collection silos and various connection pipes also inside the building - ref. 104
- Following the dismantling of the system, it will be the contractor's responsibility to close the openings on the facade/roof of the building. The disposal of any material contained in the above assets will be the responsibility of the contractor -
Server time Sat 21/12/2024 at 09:30 | Europe/Rome