Heure du serveur dim. 09/03/2025 heures 03:39 | Europe/Rome

Mechanical industry
Machinery and equipment

Enchère n. 5091

Tribunal de Milano - Échec n. 366/2019

Plus qu'un emplacement

Mechanical Industry - Machinery and Equipment - Bank. 744/2019 - Milano L. C.
Mechanical Industry - Machinery and Equipment - Bank. 744/2019 - Milano L. C.
Mechanical Industry - Machinery and Equipment - Bank. 744/2019 - Milano L. C.
107 Lots
Asta immobiliare su Gobid.it
Asta immobiliare su Gobid.it
lun. 20/05/2019 heures 15:00
lun. 10/06/2019 heures 15:13
  • Description

Mechanical Industry - Machinery and Equipment

Creditors Agreement n. 82/2018 - Milano Law Court

WHOLESALE OF ALL LOTS

On sale machinery and equipment for the mechanical industry located at two different sites, in addition to lifting equipment and vehicles.


For further information consult lot webpages

The sale is carried out under the following conditions:
 
- the purchaser's acceptance of all obligations to guarantee conformity and / or good functioning deriving from the sale of the goods sold;
 
- the sale of all the assets that make up the Lots in word as "Lots are sold as is" in the state of fact and law in which they are found, as well as in body and not to measure, with the express exclusion of the art. 1538 c.c. and of any guarantee by Sofir with respect to the goods themselves
 
 
Viewing is recommended

The availability of the use and maintenance manuals of any goods sold is not guaranteed

Lots 2 - 5 - 11 - 14 - 17 - 43 present notes indicated in the individual lot webpages.

The bidder must arrange, at his sole responsibility, for the disposal of all the goods constituting the two lots purchased and not taken from

For lots located in Orbassano (lots from 1 to 60), the bidder must arrange, at his sole responsibility, to dismantle and remove the constituent goods within 240 days from the completion of the transfer, with a penalty of € 30.500,00 for each month or fraction of month of delay
 
For lots located in Milan (lots from 61 to 107), the bidder must provide, at his sole responsibility, for the dismantling and removal of the constituent goods within 150 days from the completion of the assignment, with a penalty of € 16.000,00 for each month or fraction of month of delay
  • Vision :By appointment
  • Dépôt de garantie :EUR 63.000,00
  • effacer tous les filtres
déployé
 
  • 24
  • 36
  • 48

Ventes associées

Besoin d'aide?