Zerbitzariaren ordua Sun 09/03/2025 orduak 03:57 | Europe/Rome

Mechanical industry - Machinery and equipment

Enkantea n. 5091

Epaitegia Milano - Huts egin. n. 366/2019

Ubicazio bat baino gehiago

Mechanical Industry - Machinery and Equipment - Bank. 744/2019 - Milano L. C.
Mechanical Industry - Machinery and Equipment - Bank. 744/2019 - Milano L. C.
Mechanical Industry - Machinery and Equipment - Bank. 744/2019 - Milano L. C.
107 Lotes
Asta immobiliare su Gobid.it
Asta immobiliare su Gobid.it
Mon 20/05/2019 orduak 15:00
Mon 10/06/2019 orduak 15:13
  • Deskribapena

Mechanical Industry - Machinery and Equipment

Creditors Agreement n. 82/2018 - Milano Law Court

WHOLESALE OF ALL LOTS

On sale machinery and equipment for the mechanical industry located at two different sites, in addition to lifting equipment and vehicles.


For further information consult lot webpages

The sale is carried out under the following conditions:
 
- the purchaser's acceptance of all obligations to guarantee conformity and / or good functioning deriving from the sale of the goods sold;
 
- the sale of all the assets that make up the Lots in word as "Lots are sold as is" in the state of fact and law in which they are found, as well as in body and not to measure, with the express exclusion of the art. 1538 c.c. and of any guarantee by Sofir with respect to the goods themselves
 
 
Viewing is recommended

The availability of the use and maintenance manuals of any goods sold is not guaranteed

Lots 2 - 5 - 11 - 14 - 17 - 43 present notes indicated in the individual lot webpages.

The bidder must arrange, at his sole responsibility, for the disposal of all the goods constituting the two lots purchased and not taken from

For lots located in Orbassano (lots from 1 to 60), the bidder must arrange, at his sole responsibility, to dismantle and remove the constituent goods within 240 days from the completion of the transfer, with a penalty of € 30.500,00 for each month or fraction of month of delay
 
For lots located in Milan (lots from 61 to 107), the bidder must provide, at his sole responsibility, for the dismantling and removal of the constituent goods within 150 days from the completion of the assignment, with a penalty of € 16.000,00 for each month or fraction of month of delay
  • Ikusmena:By appointment
  • Diru-sarrera:EUR 63.000,00
  • sareztu denean iragazkiak
zabaldua
 
  • 24
  • 36
  • 48

Lotak erlazionatuta

Zerbitzu behar duzu?