OFFER COLLECTION - Buildings under construction in Jesi (AN), via Roma - COMPLETE LOT
The properties are registered in the Land Registry of the Municipality of Jesi on Sheet 64:
Parcel 63 – Sub 114 – Unit under definition
Parcel 63 – Sub 207-279-280-281 – Unit under construction
Parcel 63 - Sub 282 – BCNC
The lot in question consists of various real estate units under construction in the residential complex called "Borgo Cartiera".
The properties are part of three distinct buildings named B, C, and E.
Buildings B-C
The two buildings in question have a common condominium entrance and currently the works are incomplete both in the apartments and in the common areas. They consist of four above-ground floors, plus an attic and a basement. Currently, the internal division consists of 14 apartments and two basement rooms.
The progress of the works varies depending on the units considered: the rooms on the basement floors and the two apartments on the ground floor are completely in a raw state, while on the upper floors the plaster and screeds have been almost everywhere completed and some external fixtures are present, many without glazing, and the systems have been partially installed.
Building E - basement floor
The main gross area of the rooms, calculated taking into account the surface of the internal and external walls, is estimated at 437 sqm; the actual consistency is difficult to assess as there are several walls of considerable thickness; moreover, the various rooms have variable net internal heights. The rooms are still in a raw state.
The properties are framed within a Recovery plan initiated by a private entity called "Ex Cartiera Ripanti", definitively approved on 06/06/2005 with an Urban Planning Agreement signed with the Municipality on 25/10/2005.
Parcel 63 sub 207 represents, in addition to a portion of underground rooms, also the overlying pedestrian area for condominium use that develops along two sides of the above-ground building. It will be the responsibility of the successful bidder to proceed with the subdivision of this parcel, as the pedestrian area will not be transferred but will remain the property of the bankrupt company.
It should be noted that the building permits are currently expired and it will therefore be necessary to submit a new project requesting the necessary permits for the completion of the works.
For further information, please consult the appraisal and the attached documentation.
Lot Code: 1